Evergreen Roofing — Newport BeachGet matched with vetted Newport Beach roofers in minutes.(949) 691-0130Free quote

Note

What actually happens during a re-roof

Day by day, so nothing on your driveway comes as a surprise.

Or call (949) 691-0130
Note1 min readNewport Beach, CA

Get quotes instead

Three questions, up to three contractors, nothing charged.

Or call (949) 691-0130

Free · Nothing to pay, ever

Get quotes instead

Three questions, up to three contractors, nothing charged.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Free either way, and never more than three contractors.

Before the first day

Permit pulled, material delivered — usually to the driveway, sometimes onto the roof. Move cars, clear the drive, and take pictures off the walls upstairs.

Day one: tear-off

The loudest day. The old covering comes off, the deck is inspected, and any rotten sheathing is replaced at the rate agreed in the contract. This is the day the price can move, which is why that rate matters.

Day two: dry-in and covering

Underlayment, ice-and-water where required, drip edge, then the covering goes on from the eaves up. Flashings and penetrations are detailed as the crew reaches them.

Finishing

Ridge, ventilation, final flashing, then clean-up and a magnet run for nails. Walk it with the contractor before the final payment, and keep the paperwork.

Get it priced

It is free, and nothing obliges you to hire anyone.

(949) 691-0130Call nowFree quote