Note
What actually happens during a re-roof
Day by day, so nothing on your driveway comes as a surprise.
Get quotes instead
Three questions, up to three contractors, nothing charged.
You are on the list.
No provider in Newport Beach is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before the first day
Permit pulled, material delivered — usually to the driveway, sometimes onto the roof. Move cars, clear the drive, and take pictures off the walls upstairs.
Day one: tear-off
The loudest day. The old covering comes off, the deck is inspected, and any rotten sheathing is replaced at the rate agreed in the contract. This is the day the price can move, which is why that rate matters.
Day two: dry-in and covering
Underlayment, ice-and-water where required, drip edge, then the covering goes on from the eaves up. Flashings and penetrations are detailed as the crew reaches them.
Finishing
Ridge, ventilation, final flashing, then clean-up and a magnet run for nails. Walk it with the contractor before the final payment, and keep the paperwork.